Adesto Technologies (Dialog Semiconductor) > Case Studies > Using LonWorks to Keep Acela Trains Zip Along

Using LonWorks to Keep Acela Trains Zip Along

Adesto Technologies (Dialog Semiconductor) Logo
 Using LonWorks to Keep Acela Trains Zip Along  - IoT ONE Case Study
Technology Category
  • Actuators - Electrical Actuators
  • Functional Applications - Remote Monitoring & Control Systems
  • Infrastructure as a Service (IaaS)
  • Sensors - Accelerometers
  • Sensors - Airflow Sensors
  • Sensors - Dimension & Displacement Sensors
  • Sensors - Vibration Sensors
Applicable Industries
  • Railway & Metro
Applicable Functions
  • Business Operation
  • Maintenance
Use Cases
  • Machine Condition Monitoring
  • Remote Control
The Customer
About The Customer
The Challenge

Canadian transportation company, Bombardier was tasked with building a bullet train system on rails that were designed for lower speed trains. In addition, they had to ensure safe and optimal operation at high speeds, maximize train uptime and enhance communication with passengers.

The Solution

Bombardier chose Echelon's LonWorks solutions to tackle the aforementioned challenges. With the help of the LonWorks monitoring network, engineers can have access to all forms of vital information such as speed, pre-departure tests, brake gauges, alarms,schematics of the train and options that give the status of any system in any part of the train to any level of detail desired. Using a keypad, the crew can activate menus to obtain instantaneous information, critical for safe and efficient operation. In addition, using the LonWorks network, the crew can control air dampers on the train, such as when entering a tunnel. The LonWorks platform also allows access to maintenance information. In addition, the LonWorks platform also interacts with passengers. Before boarding the train, passengers read the external LC display signs on the side of every car, which provide basic train information such as the destination. Once aboard, passengers can refer to general information LCD displays for messages from the crew. Lastly, if passengers are curious about their progress on the journey, they can look at another LCD display in their car.

Data Collected
Infrastructure Condition, Installation Diagnostics, Passenger service, Per-Unit Maintenance Costs, Uptime
Operational Impact
  • [Efficiency Improvement - Integration]
    LonWorks Networks are right on track besides meeting the requirements for a powerful monitoring system and reducing wiring costs, the LonWorks system gives excellent integration benefits to Bombardier.
  • [Efficiency Improvement - R&D]
    LonWorks simplified and expedited the design process. The risk is limited because you don’t have to make a decision too early in the project.
  • [Cost Reduction - Maintenance]
    LonWorks is also likely to reduce maintenance cost and result in easier fixes.

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

Related Case Studies.

Contact us

Let's talk!
* Required
* Required
* Required
* Invalid email address
By submitting this form, you agree that IoT ONE may contact you with insights and marketing messaging.
No thanks, I don't want to receive any marketing emails from IoT ONE.
Submit

Thank you for your message!
We will contact you soon.