Case Studies.
Add Case Study
Our Case Study database tracks 18,927 case studies in the global enterprise technology ecosystem.
Filters allow you to explore case studies quickly and efficiently.
Download Excel
Filters
-
(5,794)
- (2,602)
- (1,765)
- (764)
- View all
-
(5,073)
- (2,519)
- (1,260)
- (761)
- View all
-
(4,407)
- (1,774)
- (1,292)
- (480)
- View all
-
(4,158)
- (2,048)
- (1,256)
- (927)
- View all
-
(2,488)
- (1,262)
- (472)
- (342)
- View all
- View all 15 Technologies
- (1,732)
- (1,626)
- (1,605)
- (1,461)
- (1,423)
- View all 42 Industries
- (5,782)
- (4,114)
- (3,091)
- (2,780)
- (2,671)
- View all 13 Functional Areas
- (2,568)
- (2,482)
- (1,866)
- (1,561)
- (1,537)
- View all 127 Use Cases
- (10,333)
- (3,499)
- (3,392)
- (2,982)
- (2,593)
- View all 9 Services
- (503)
- (432)
- (382)
- (301)
- (246)
- View all 737 Suppliers
Selected Filters
|
Facility Management Solution in Construction Industry
In the construction of Crown Towers in Perth, hundreds of workers enter and exit the construction site each day, totalling into thousands by the completion of the project. All of these workers perform different tasks and come from different agencies, making it difficult for supervisors to track who does what, when, and where on such a large-scale site. An easy-to-use access, security and facility management solution was required.
|
|
|
Unmanned Aircraft Systems (UAS) Ground Control Station (GCS)
General Atomics had to meet strict requirements for data bandwidth and availability. They could have designed and implemented a custom solution for data integration on their own, but that would have significantly delayed the project. Plus the lifecycle cost of developing and maintaining a custom software solution for a specific project can be enormous.
|
|
|
Elisa is Paving the Way with Their IoT Service Solution
With an overwhelming response to the release of their IoT solution, Elisa needed a way to manage the flood in demand without compromising on their customer satisfaction or quality.
|
|
|
Boeing Cuts Production Time by 25% with Skylight on Glass
130 miles of wiring go into every new Boeing 747-8 Freighter, tucked away overhead and underfoot from the cockpit to the wheel wells.Every Boeing aircraft, from the workhorse 737 to the new 787 Dreamliner, has multiple configurations, each with its own wiring scheme. In past years, technicians used “phone books” full of diagrams to do their work. Even with laptops, the same basic problem arised: constant look-away interruptions as workers got directions and cross-checked diagrams and schematics.
|
|
|
Refinery Wirelessly Monitors Junction Box Pressure
The refining company needed to continuously monitor the pressure in Z-Purge junction boxes around the refinery. These junction boxes were maintained at a low positive pressure to prevent process gasses from entering the junction boxes. These junction boxes are widely distributed throughout the plant. Previously these junction boxes were manually monitored by operators on periodic rounds in the refinery.
|
|
|
Reducing Energy Costs Across Pella’s Manufacturing Plants
Pella’s commitment to continually improve its processes for its team members and the environment has led the company to seek innovative technologies that advance overall productivity and the quality of its manufacturing operations.
|
|
|
Smart Tractor with Telemetrics to Boost Productivity and Revenue
Hello tractor had designed an innovative, low-cost “smart tractor” specifically for small farmers' unique needs. Equipped with various attachments, owners can tailor its use for a variety of crops and stages of the production cycle, allowing them to serve their customers throughout the year. The GPS antenna allows hello tractor to track its usage and gather data on location, market trends, and uptake. Hello Tractor needed an application so that farmers could make use of these features effectively and efficiently.
|
|
|
Reduce the Energy Consumption of Air Cooled Condensers
Altiux's client organization is at the forefront of technology adoption in its manufacturing processes and had already implemented advanced control systems. However operating expenses still remained on the higher side due to inefficiencies in certain processes which required manual intervention. The challenge for Altiux was to understand the nature and root causes of these inefficiencies and make recommendations for reducing the operating expenses. Our observation was that data was being generated with a millisecond level resolution and hundreds of simultaneous fluctuations made it near impossible for the operators to make optimal control decisions consistently. As significant investments had already been made in the instrumentation of the operational equipment, the management was hesitant to make modifications to existing systems and processes. Altiux was asked to make recommendations such that it could blend in with existing processes and additional capital expenditure or staff retraining was not required. The Air Cooled Condenser system at the client's captive power plant was operated using a series of VFD fans. The rotational speed of these fans were being manually set from the control centre, based upon the experience of the operator. Moreover the fans were being operated in different speeds, with fans closer to the turbine operating at near full speed. Thus the first phase of Altiux engagement involved optimization of the captive power plant's steam cooling subsystem.
|
|
|
ThingWorx Delivers Business Transformation to Sysmex
With a mature business comprising connected field instruments for remote monitoring, Sysmex realized that the next step in order to transform their business would be to unlock more value from their data. The only way they could outpace their competitors would be to deliver higher quality customer service and improve their internal operational efficiency.
|
|
|
The Retail Shelf-Auditing Robot
Full-store audits involve making sure that items are in stock, in the right place, and marked at the correct price. These tasks must be repeated over and over, typically take several hours to complete, and tend to be very inaccurate when done by humans.
|
|
|
IoT based Energy Quality Availability Monitoring Solution
There were several challenges faced:Since this data would be in the public domain, accuracy and authenticity of this data were of paramount importance. It should be able to withstand scrutiny.It is challenging to build an appliance that can withstand a wide range of voltage fluctuations from as low at 90v to as high as 320v. Since the device would be installed in remote locations, its resilience was of paramount importance.The device would have to deal with poor network coverage and have the ability to store and re-transmit data if networks were not available, which is often the case in rural India. The device could store up to 30 days of data.The platform that deals with the data should be readily available and highly reliable and never lose a packet of data.
|
|
|
Springpath Gains Real-Time Intelligence and Improves Operational Efficiencies
As the HCI market has grown increasingly crowded, Springpath sought to differentiate itself by providing enhanced serviceability to its customers. But it was lacking in its ability to provide fast customer issue resolution for both hardware and software components and in its ability to get meaningful, real-time intelligence from data. Springpath needed to create better operational efficiencies for its support organization. To better service its customers, Springpath would need a solution to resolve customer issues faster while collecting real-time customer data from systems to extract better insights for both internal support teams and end customers alike. Building a solution would require quick ingest and parsing of data – which was at the time often sent in the form of complex log files – and the ability to present it as actionable information. Further, a solution would need to enable support engineers to provide quick issue resolution to minimize downtime. Ideally, Springpath wanted customers to get full visibility into their own systems – and thereby be able to perform timely maintenance tasks – with the goal of maximizing uptime and ensuring optimal system performance. In addition, a solution should integrate with their issue management system, Salesforce.com Service Portal, for easy access for both the in-house support team and end-customers. “Offering world-class Customer Service in the IoT era requires a comprehensive and scalable Analytics platform that is well-integrated with an existing Support workflow,” says Brett Flinchum, VP of Global Customer Success at Springpath.
|
|
|
Cluster Pumping Station Automation of Oil and Gas Reservoir Pressure Maintenance
To develop a reservoir pressure maintenance automation system to remotely control, monitor, and protect devices in pumping station.
|
|
|
Schedule Management in the Austrian Energy Market
Due to the growing volume of customers and data, Salzburg AG needed a solution to promptly and correctly manage the processing of energy transactions in multiple markets using schedules. Requirements included: flexible adaptation of interfaces to enable Salzburg AG to respond to market conditions quickly, automatic processing of energy transactions, and integration of different regional rules for the exchange of schedules.
|
|
|
Transcode Creates a Vehicle Fleet Management solution with Intel IoT Gateway
Problem: Inefficient vehicle fleet management hinders business efficiency, employee productivity, and revenue growth opportunities. - Difficult to manage fleet operations, particularly in tracking their daily activities- Challenge for business owners to monitor their drivers’ behavior and daily productivity. Business owners need to ensure that their drivers are following business rules and policies.
|
|
|
Real-time visibility of Supply chain operations with IoT
Food service delivery companies generally manage large volumes of food or non-food products, with very low profit margins. And, one of their major challenges involves optimizing operational efficiency during food delivery, for accelerated business growth and competitive advantage.However, to address this challenge, they had no means to know what exactly happens during the delivery hours. Was the food inventory ready to deliver is kept under optimum temperature conditions? Were the drivers taking the right routes? Was the customer order being delivered on time? Their business required visibility of its supply chain operations in real-time, so they could track & monitor what’s happening every minute. This would help optimize operations and save money.
|
|
|
Real-time Monitoring and Unified Management Platform for PV Plant
As PV power plants continue to increase, centralized management and information integration become thorny problems.Enterprise PV systems mainly supply power for their own needs and may sell excess power to the power company whereas Photovoltaic (PV) power plants specialize in solar energy collection and then feeding the energy into the grid.To transmit the data of the PV systems wired or wireless networks can be used. However, wireless networks have the advantage of flexibility and are the best choice for those who want quick deployment.Taking into account the requirements of wider coverage and long-distance transmission, the existing fiber-optic networks had many shortcomings ie high cost, complicated wiring and long construction period, and it may also have been necessary to excavate walls, drill holes, embed wires, or even destroy the original building structure. After evaluation, the Juli Group decided to adopt an easy installation and easy expansion wireless network system for early completion of this project.
|
|
|
Digital Manufacturing Powers a Better Way to Build Trucks
• Deliver customized vehicles for consumers, better and faster • Control costs by boosting manufacturing efficiency • Improve agility and scalability to support innovation and future production needs
|
|
|
Smart parking in Ibiza, Spain
With 133,000 inhabitants that receives more than 2 million tourists a year, this seasonal influx complicated access to the Ibiza's centre and caused congestion of vehicles looking for parking in La Marina. This affected the well-being of the population and even had a negative impact on trade and the image of the area. The project that we implemented for the local government sought to: -Speed up parking in La Marina. -Reduce vehicle flow to the centre. -Improve the quality of life and satisfaction of residents and tourists. -Promote the shopping area of the centre.
|
|
|
Hitachi Data Systems (Hitachi) - Global Manufacturers Improve Yield by 90 Percent
The company’s polymer mixing process was producing output of inconsistent quality, with yields sometimes dipping as low as 50% or 60%. The scrapping of poor batches created huge costs and was crippling production capacity. The root cause was traced to ever-changing product specifications, in addition to variations in a range of production parameters. Production engineers were unable to stabilize the process using traditional approaches as mixing polymer was stubbornly unstable and each new product formulation only exacerbated the problem. To solve this issue, this global manufacturer needed a solution that provided the following capabilities: • Ingest and integrate Internet of Things (IoT) data from machinery, sensors, the environment and other sources • Discover the critical factors and optimal process parameters through correlation, visual analysis, and optimization algorithms • Provide deep process insight, enabling daily decision support and continuous improvement • Dynamically and continuously optimize the process through machine learning
|
|
|
SKT, Construction of Smart Office Environment
SK T-Tower is the headquarters of SK Telecom. Inside the building, different types of mobile devices, such as laptops, smartphones and tablets, are in use, and with the increase in WLAN traffic and the use of quality multimedia data, the volume of wireless data sees an explosive growth. Users want limitless Internet access in various places in addition to designated areas.
|
|
|
Driving Digital Transformation: Emerald
Emerald worked with Cisco to shrink the time to production for its manufacturing process automation system. The leadership team sought self-deployed solutions that would drastically decrease installation time, reduce complexity, and increase security.
|
|
|
Petropriar Uses Operator Rounds to Improve Asset Performance and Avoid Unplanned
Petropriar, S.A., a subsidiary of Petróleos de Venezuela S.A., owns and operates oil and natural gas reserves in the country’s Orinoco Belt. Petropriar needed an easy way to manage the inspection of its rotating electrical and static equipment at one of its industrial complexes.
|
|
|
High-end, scalable Cloud based IIoT solution for Device Management & Analytics
Many instrumentation leaders face challenges including how to:Track & monitor their instrument data such as Temperature, Humidity, Dew point or PressureAchieve real-time visibility of data to take necessary measures/actions.Enable Remote Asset management capabilities to keep a watch on the end-devices at pre-scheduled intervalsIntegrate notification engine to alert the end-customers in case of asset failures or abnormal conditions
|
|
|
Reshaping the Shipping Industry
Loading of containers on to the deck of a container ship lacks correct data of container weight. This causes less than optimum load balance, risk of containers breaking loose and dropping to the sea, even capsizing. Further, the full capacity of the vessel can't be utilized with unreliable load weight data.
|
|
|
Premium Brand
Due to doubled data traffic demand, Telstra wanted a solution that can meet insatiable high-speed mobile broadband demand and secure a smooth network migration while re-farming spectrum.
|
|
|
IIC - Edge Intelligence Testbed
A test environment is needed for algorithms and architectures that meets a common set of requirements for many testbeds (see "Testbed in Depth")GOAL:A test facility that can be configured into complex edge compute environments, in order to further the state-of-the-art in edge analytics and algorithms
|
|
|
Smart Turf Harvesting Machine
Delivering a high-performance, automated turf harvester that reliably and efficiently palletizes turf in a variety of farming conditions while increasing farm productivity, reducing machine operating costs, and providing a secure Internet gateway to remotely monitor and control the turf harvester.
|
|
|
Special AGV - China - Axter
The client faces complex material handling due to non-standard load dimensions and weight, increasing safety risks and load handling damages.
|
|
|
Drug Maker Takes the Right Prescription
China Pharm decided to build a cloud-based platform to support the requirements of IT planning for the next five to ten years which includes a dynamic and scalable mail resource pool platform. The platform needed to have the following functions: all nodes support redundancy, ensuring service continuity and good user experience, simple and easy-to-use user interfaces for end users and administrators and good compatibility and supports smooth capacity expansion.
|
|