Case Studies.
Add Case Study
Our Case Study database tracks 18,927 case studies in the global enterprise technology ecosystem.
Filters allow you to explore case studies quickly and efficiently.
Download Excel
Filters
-
(2)
- (2)
- (1)
-
(1)
- (1)
- (2)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (3)
Selected Filters
|
Time to Market, Time to Volume, Time to Money
Time is essential when it comes to introducing new products to the market. Many clients need to mass manufacture a product in a very short time. Their requirements put Foxconn under substantial pressure.
|
|
|
Metal Fabrication
As each mast section needs a total of 222 reliable welds, manufacturing them is an extremely labor intensive process.Until recently, STROS had to use highly skilled welders to make these sections. Although it has been using robots for 25 years, these machines could not manage the complex arc welds in narrow spaces needed for these particular components. Consequently, in order to produce a satisfactory number of mast sections it had to employ three welders per shift at three separate workstations to make these pieces. Apart from the obvious outlay this required in terms of manpower and space, STROS found it increasingly difficult to recruit the highly qualified welders needed for this work. That's why in 2007 the company decided to hold a tender for the complete robotization of its manufacturing process for mast sections. Of the four firms who participated, only the ABB group could fulfill all its requirements.
|
|
|
ABB Brazil Saved 30% on Testing Time Thanks to Panaya Test Center
The stakes are high for ABB Brazil, an organization with five business divisions. Brazil has one of the most complicated tax systems in the world and SAP system errors can cause big losses for the company. Each release of new functionality is very risky, hence ABB Brazil faces huge testing challenges.Complex business scenarios with little or no documentation available.Several system changes (new functionalities, improvements, and bug fixing) being released every week which requires a huge effort to execute regression tests.The major challenge during the UAT is to keep track of all activities, spread across multiple areas/ locations and keep everything under control.
|
|