Case Studies.
Add Case Study
Our Case Study database tracks 19,090 case studies in the global enterprise technology ecosystem.
Filters allow you to explore case studies quickly and efficiently.
Download Excel
Filters
-
(3)
- (3)
- (3)
- (2)
-
(3)
- (2)
- (1)
- (1)
-
(2)
- (2)
- (3)
- (3)
- (2)
- (1)
- (1)
- (3)
Selected Filters
|
Wireless Condition Monitoring Predicts Failure Of Calendar Roll Gearbox
The calendar machine run by a motor has a shaft mounted gearbox connected to the roller. This gearbox allows maximum paper load and feeds the paper with reduced speed to the roller. In spite of scheduled preventive maintenance, it was observed that gearbox used to fail frequently. The rise in vibrations leading to the eventual failure of gearbox adversely affected the quality of the paper. Monitoring the gearbox was thus vital and critical.
|
|
|
USD 1.2 Million Saved On A Forging Press Line By Predicting Cutter Life
The major press line in the company has a circular saw machine which cuts metal rods with precision in predefined lengths for further heating in the furnace. The cut pieces are then fed to the forging line to make automotive components. The length and perpendicularity of the cut pieces are crucial to obtain a good quality forging.It was observed that circular saw failed to maintain the precise length and perpendicularity while cutting the metal rods leading to heavy rejections. This was a serious concern and routine preventive maintenance was unable to overcome it.
|
|
|
Smart Ccondition Monitoring Saves USD 30 Thousand In A Forging Unit
The 1000 Ton main forging press had a 75 HP motor and fed a trimming machine. The motor pulley combination was situated on top of the Press at a height of about 15 feet thereby reducing its access for routine maintenance. The company found difficulty ensuring constant uptime of the Press.
|
|